Concrete Calculator

Calculate the volume of concrete needed for a slab, footing, or column.

Enter values and press Calculate to see the result here.

How this is calculated

Volume = length × width × (thickness ÷ 12), converted from cubic feet to cubic yards by dividing by 27.

How concrete volume is calculated

Estimating concrete needs starts with calculating the volume of the space to be filled, then converting that volume into the number of bags or cubic yards of ready-mix concrete required, typically adding a waste margin to cover spillage and uneven excavation.

Volume formulas by shape

Slab/rectangular: Volume = Length × Width × Depth
Cylindrical (footing/post): Volume = π × radius² × height

For a 10 ft × 10 ft slab at 4 inches (0.333 ft) deep: 10 × 10 × 0.333 = 33.3 cubic feet, which converts to about 1.23 cubic yards (dividing by 27 cubic feet per cubic yard).

Converting to bags of concrete mix

Bag sizeApprox. yield (cubic feet)
40 lb bag0.30 ft³
60 lb bag0.45 ft³
80 lb bag0.60 ft³

A 33.3 cubic foot slab would need about 56 bags at 60 lb each (33.3 ÷ 0.45 ≈ 74, adjusted for typical waste factor) — always round up and add a margin for spillage.

What affects how much you need

Tips

Worked examples

Example 1 — Backyard patio slab: A 12 ft × 16 ft slab at 4 inches deep needs 12 × 16 × 0.333 = 64 ft³, or about 2.37 cubic yards. Adding a 10% waste margin brings the order to roughly 2.6 cubic yards.

Example 2 — Fence post footings: A cylindrical footing 10 inches (0.417 ft radius) wide and 2 ft deep needs π × 0.417² × 2 ≈ 1.09 ft³ per post. For 8 posts, that's about 8.7 ft³ total, or roughly 22 bags of 60 lb mix.

Example 3 — Small shed pad: An 8 ft × 10 ft slab at 3.5 inches (0.292 ft) deep needs 8 × 10 × 0.292 = 23.3 ft³, which is about 0.87 cubic yards — right at the threshold where bagged mix (roughly 52 bags at 60 lb) or a small ready-mix order are both reasonable options.

Concrete strength by project type

ProjectTypical PSI strength
Sidewalks, patios3,000 PSI
Driveways3,500–4,000 PSI
Footings, foundations3,000–4,000 PSI
Garage floors, heavy-load slabs4,000+ PSI

Frequently asked questions

Why do bag calculations always add extra material? To account for spillage, uneven sub-grade, and the tendency for actual poured depth to slightly exceed the planned depth.

How many cubic feet are in a cubic yard? 27 cubic feet — since a yard is 3 feet on each side, and 3×3×3 = 27.

Should I use bagged mix or ready-mix delivery? Bagged mix suits small projects (a few cubic feet); ready-mix delivery becomes more practical and economical for anything beyond roughly 1 cubic yard.

How long does poured concrete take to cure? Concrete reaches most of its working strength within about 28 days, though it's typically safe to walk on after 1–2 days and drive on after about a week, depending on the mix and conditions.

What happens if I pour concrete in cold or hot weather? Extreme cold can slow or halt proper curing (risking frost damage), while extreme heat can cause the surface to dry and crack faster than it cures — both often call for special additives or timing.

Do I need rebar or wire mesh for a small slab? Reinforcement isn't always required for thin, small residential slabs, but it's commonly recommended for driveways, load-bearing slabs, or any pour prone to cracking or heavy use.

How much does concrete weigh per cubic yard? Standard concrete weighs roughly 4,000 lbs (about 2 short tons) per cubic yard, which matters for delivery truck access and structural load calculations.

Can I mix concrete by hand for a small project? Yes — for a few bags (roughly under 1/3 cubic yard) hand-mixing in a wheelbarrow or mixing tub is practical; larger pours generally call for a mixer or ready-mix truck.

Another worked example

A slab 10 ft × 12 ft at 4 inches (0.333 ft) thick requires 10 × 12 × 0.333 ≈ 40 cubic feet, or about 1.48 cubic yards — rounding up and adding a 10% waste margin, ordering roughly 1.6–1.7 cubic yards would be a safer amount to request.

What affects the result

How to use this calculator

  1. Enter the length, width, and thickness/depth of your slab or footing.
  2. Press Calculate to see the required concrete volume.

Common mistakes to avoid

Key terms explained

Cubic yard: A standard volume unit used for ordering ready-mix concrete in the US.

Waste factor: An extra percentage added to a material estimate to account for spillage and irregularities.